After the doors are pre-processed, we prepare the location of the door with the floor and ceiling plate. The placement is calculated beforehand with laser guides to match the floor and ceiling plate perfectly. 1- Determine the position of pivot point A on the floor.Use the fitting template and the https://rowanonjfz.activoblog.com/26744143/5-basit-teknikleri-için-pivot-çelik-kapı