The 25mm thick heavy steel tube is pushed With all the end closed by a steel shoe. On achieving the required driving resistance, a complete length cage is lowered in to the tube and filled with significant slump concrete. The tube is then vibrated out leaving a shaft of concrete. https://valeriusj146qux2.iamthewiki.com/user